Now showing items 1-3 of 3

    • Joo, I. S.; Turner, W. D.; Song, L.; Dong, D.; Baltazar-Cervantes, J. C.; Napper, G.; Wei, G. (Texas A&M University (http://www.tamu.edu); Energy Systems Laboratory (http://esl.tamu.edu), 2007)
      Continuous Commissioning (CC) is a proven, highly cost-effective process that can improve building comfort and reduce energy consumption. This paper discusses the CC of three public schools in Austin, Texas. These schools ...
    • Dong, D.; Liu, M. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2005)
    • Song, L.; Joo, I.; Dong, D.; Liu, M.; Wang, J.; Hansen, K.; Quiroz, L.; Swiatek, A. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2003)
      This paper demonstrates the benefits of optimal control in well-designed and operated buildings using a case study. The case study building was built in 2001. The HVAC and control systems have been installed with ...